A gantry to reinforce vigilance and safety on site

Vaujours portique de sécurité

The safety of our employees is a priority. In partnership with Placo®/ Saint Gobain, a safety gantry has been installed at the site in Bernouille (93). This device, a key element of our QSE (Quality, Safety, Environment) approach, serves as a reminder of the career instructions to be followed on site. The key idea is Vigilance = Safety.

On this gantry, several points of vigilance are highlighted to ensure collective safety :

✔️ Compulsory PPE : Wearing personal protective equipment is an essential requirement for all on-site workers. Everyone must wear their own PPE to guarantee optimum protection.

✔️ Specific equipment : Special protective equipment is required for certain tasks or for access to underground quarries. This equipment guarantees the safety of work carried out in these sensitive areas.

✔️ Traffic rules : Strict separation between pedestrians and machinery is essential for safe co-activity. Everyone on site must respect these rules to avoid accidents.

✔️ Prohibitions : Certain practices are strictly forbidden. In particular, the use of cell phones. Any distraction entails a risk.

This project was carried out in close collaboration with Placo®/ Saint Gobain. This commitment, shared by all those involved on site, makes safety a collective priority and an essential value.

Latest news

Voeux ECT 2026
01/01/2026

Our best wishes for 2026

  Best wishes 2026 Together, let’s continue to sustainably transform our communities. Thanks to your trust, ECT develops and delivers meaningful projects for local governments and the people they serve.

Read more
Louis - Paysagiste
18/12/2025

Landscape designer : when excavated earth becomes a land project

In May 2025, Louis Canesse joined the ECT landscaping team as a landscape designer. Today, he talks about the landscape designer’s role in the company’s non-built projects. FFrom project planning

Read more
ECT Icone ouverture de site
11/12/2025

ECT Hauts de France opens a new site in Harnes (62)

An accessible site for inert soil from the local construction industry Since December 8, the site in Harnes has been receiving inert soil from local construction sites. Located just 5

Read more

Pour recevoir
les dernières actualités d'ECT