Explore our photo gallery dedicated to the manufacture and installation of the fertile substrate for the future Parc du Sempin in Chelles. These images illustrate every stage of this innovative process, from the preparation of green waste compost and inert soil from the construction industry to their mixing and application on site. Find out how our teams transform these recycled materials into fertile soil, ready to be planted in the park.
- Seine-et-Marne
- ECT Ile de France
July 2024, production of fertile substrate at the Chelles site
Latest news
Opening of Val Saint-Germain Les Houdoux site (91)
Opening of a new ECT site in Essonne (91) Since February 23, 2026, the Val Saint-Germain – Les Houdoux site in Essonne has been open to inert soil deliveries. The
Read more
New hybrid bulldozer and 3D GPS
As part of its commitment to responsible innovation, ECT is expanding its range of public works equipment with the Caterpillar D6 XE hybrid GPS 3D bulldozer (exclusive distributor Bergerat Monnoyeur).
Read more
Acting for the climate and ecological transition of territories
Climate and ecological transition cannot be decreed. It is built on the ground, project after project, through development choices that are capable of responding to climate requirements, biodiversity issues, and
Read more




