Explore our photo gallery dedicated to the manufacture and installation of the fertile substrate for the future Parc du Sempin in Chelles. These images illustrate every stage of this innovative process, from the preparation of green waste compost and inert soil from the construction industry to their mixing and application on site. Find out how our teams transform these recycled materials into fertile soil, ready to be planted in the park.
- Seine-et-Marne
- ECT Ile de France
July 2024, production of fertile substrate at the Chelles site
Latest news

First hydrogen truck for transporting excavated soil
At Solutrans, Hyliko, in partnership with ECT, is handing over to the Mauffrey group the keys to the first “worksite approach” hydrogen truck for low-carbon worksites, with a view to
Read more
ECT project at Vaux le Pénil (77): end of soil inputs
The Tertre des Roche development project in Vaux le Penil (Seine-et-Marne- 77) is taking shape. Opening to the public is scheduled for spring 2026. Creation of fertile soil on the
Read more
New ECT site in the coalfield, Auby (59)
A new site in Auby, northern France, to receive excavated soil from the construction industry Since September 2025, the Auby (59) site has been receiving inert soil from construction sites
Read more




