FONTENAY-EN-PARIS (95)
DAP The excavation site must be validated and registered by ECT with a PAD. Request for Prior Acceptance BTP Customer Area Manage your business with the ECT extranet Information available in real time Login How do you use the land on this site? Which ECT project? Rehabilitation and development NATURAL AREA After a clean-up phase, the site is now being restored with soil from local construction sites. These materials will be used to shape the sloping terrain, making the site safer and preventing illegal occupation. The project includes the creation of a natural wooded area covering 1.5 ha. See all
FONTENAY-EN-PARIS (95) Read More »