[Sport en ville] A mountain bike and trials stadium built in 4 months

ECT, proud to present its latest project: a mountain bike and trials stadium in Epône, Yvelines (78) Built between June and September 2020, using excavated earth from the West Paris construction industry, construction time was short. This project is being carried out on municipal land. It was designed in collaboration with the local MTB and Trials cycling association, ORC Epône. And with the ambition of creating the first complete trials and mountain bike stadium in the Paris region, for training and competition. The work involved in setting up the trial fixtures and mountain bike training tracks was very precise. It

[Sport en ville] A mountain bike and trials stadium built in 4 months Read More »

ECT INNOVATES FOR ITS CONSTRUCTION CUSTOMERS AT THE PLACO® DE VAUJOURS SITE

An outdoor platform cuts unloading time by a factor of 5. Inaugurated at the end of 2019, this innovation makes it possible to unload very quickly and safely. Unloading now takes 8 minutes, instead of the previous 45 minutes. A video review of the customer benefits and optimizations offered by this platform.

ECT INNOVATES FOR ITS CONSTRUCTION CUSTOMERS AT THE PLACO® DE VAUJOURS SITE Read More »

[Presse] Akuo and ECT inaugurate the Gabots photovoltaic power plant

On September 29, Akuo and ECT inaugurated the “Les Gabots” solar power plant in Annet sur Marne (77). The plant comprises 44,000 solar panels, spread over 19 hectares of former ECT landfill. This makes it one of the two largest photovoltaic ENR production sites in the Paris region. Its power, equivalent to the electricity needs of 3,700 households, transforms Annet-sur-Marne into a positive green energy town. “Seine-et-Marne : une centrale de 44 000 panneaux solaires sur un ancien remblai” – Article by Hendrick Delaire, dated September 29, 2020 Read the article “Ile-de-France solar power rises in the east” – Article

[Presse] Akuo and ECT inaugurate the Gabots photovoltaic power plant Read More »

Inauguration centrale Annet-sur-Marne - Septembre 2020

ECT and AKUO inaugurate one of the two largest solar power plants in the Paris region

September 29, inauguration of the photovoltaic power plant The 1st panel of the solar power plant was officially installed on November 14, 2019. Ten months later, ECT and AKUO inaugurate the “Les Gabots” photovoltaic power plant in Annet-sur-Marne. One of the largest solar farms in the Paris region The solar power plant, comprising 44,000 photovoltaic modules, covers an area of 18.5 hectares. It avoids 847 tonnes of CO2 emissions per year. Electricity production covers the power supply needs of 3,700 households, or almost 10,000 inhabitants. It makes the commune of Annet-sur-Marne (population 3,300) a positive-energy commune. Giving a second life

ECT and AKUO inaugurate one of the two largest solar power plants in the Paris region Read More »

ACT-E inaugurates “Les Gabots” solar power plant, one of the largest in the ÃŽle-de-France region

France, Annet-sur-Marne, September 29, 2020 – ACT-E, a joint venture between Akuo, a French independent producer of renewable and distributed energy, and ECT, a company specializing in the recovery of inert materials from construction sites, today inaugurated the “Les Gabots” photovoltaic power plant in Annet-sur-Marne. With a production capacity of 17 MWp, it is one of the largest solar power plants in the Paris region. One of the largest solar farms in the Paris region The plant, comprising 44,000 photovoltaic modules, covers an area of 18.5 hectares. It avoids 847 tonnes of CO2 emissions per year. Electricity production covers the

ACT-E inaugurates “Les Gabots” solar power plant, one of the largest in the ÃŽle-de-France region Read More »

A wealth of news from the ECT center for the biological treatment of hydrocarbon-impacted soil

At La Courneuve, the ECT center for the biological treatment of hydrocarbon-impacted soil was inaugurated 3 years ago. The first and only indoor facility of its kind in France, the center can now process 180,000 tonnes of impacted soil every year. It regularly attracts media and expert interest. An overview of recent visits. August 2020, Cayola Construction Journalist Charlotte Divet has an article entitled “Grand Paris, a covered center to decontaminate 180,000 tons of soil a year” and a comprehensive video report on the operation of the center for treating soil polluted with hydrocarbons. Watch the video August 2020: IXI

A wealth of news from the ECT center for the biological treatment of hydrocarbon-impacted soil Read More »

ECT builds a mountain bike and trials stadium in Epône in just 4 months

A mountain bike and trial bike stadium, the only one of its kind in the Paris region, to be built in 3 months, between June and October 2020. On June 15, ECT announced the opening of a new site for the recovery of excavated inert soil in the Yvelines department, more precisely in the commune of Epône. And so the project, supported by the town council, was launched. And so began ECT’s development of the first trial bike and mountain bike site in the Ile-de-France region, on communal land. Three months later, we take a look back at a project

ECT builds a mountain bike and trials stadium in Epône in just 4 months Read More »

Pour recevoir
les dernières actualités d'ECT