ECT site closures for the week of May 6, 2024

We would like to inform you that during the May bank holiday period 2024, all our current sites will remain open except for :

  • Baillet-en-France site (95): closed on Friday, May 10
  • Plaisir site (78): closed on Friday, May 10
  • Boissy-l’Aillerie site: closed on Friday, May 10
  • Villeneuve-sous-Dammartin (77) site: closed on Friday May 10 and Saturday May 11

All other sites remain open at their usual times.

If you have any questions, please do not hesitate to contact your sales representative.

Latest news

Baptiste conducteur de bull
16/10/2026

From a Work-Study Program to a Permanent Contract: The Journey of a Heavy Equipment Operator

At our sites, a bulldozer operator shapes the terrain using soil from construction sites. At the controls of his machine, he pushes, spreads, and levels these materials to give them

Read more
ECT signe la Charte métropolitaine pour une construction circulaire
12/10/2026

ECT Signs the MGP Charter for Circular Construction

Circular construction is a collective endeavor. It is with this conviction that Sofiane Chikh, Director of Development and Planning at ECT, signed the Metropolitan Charter for Circular Construction, spearheaded by

Read more
Inauguration Mazingarbe
12/10/2026

Terril 49 in Mazingarbe: Forest, Seed Orchard, and Greenway Inaugurated

On October 7, nearly 50 people gathered in Mazingarbe to inaugurate the forest area, the seed orchard, and the greenway developed at the foot of slag heap 49. At the

Read more

Pour recevoir
les dernières actualités d'ECT