New site : restoration of a former quarry at Villeneuve-les-Sablons (60)

ECT Icone ouverture de site

Opening of a new ECT site in Villeneuve-les-Sablons, Oise (60)

Starting January 12, the Villeneuve-les-Sablons quarry will open to our construction industry clients. Located 25 km from Cergy-Pontoise, the site accepts inert soil from local construction projects.

The purpose of this site is to rehabilitate a former quarry.

Upon opening, the site will be fully prepared to welcome our construction clients under optimal conditions :

  • Soil traceability : at the receiving station, installation of load-inspection cameras, a radiation detection portal, and weighbridges to ensure weighing and per-ton billing.
  • Opening hours : the site is open from 7:30 a.m. to 4:30 p.m., with the last incoming truck at 4:15 p.m.

    Types of soil accepted : K3 and K3+.

To access the Villeneuve-les-Sablons site, prior approval from ECT’s booking department is required.

Latest news

Saison plantation 2026
30/03/2026

53,000 trees and shrubs planted!

ECT rolled out this planting campaign as part of its development projects, carried out in coordination with local authorities. Project landscaping consistently incorporates goals of ecological restoration and the rehabilitation

Read more
Cheffes de projet - ECT (2)
25/03/2026

ECT Project Leaders : Transforming Regions in Practical Terms

Every ECT development project brings about lasting change to a site, benefiting the local communities and their residents. At the heart of this effort is the Development Department, where project

Read more
ECT Icone ouverture de site
23/02/2026

Opening of Val Saint-Germain Les Houdoux site (91)

Opening of a new ECT site in Essonne (91) Since February 23, 2026, the Val Saint-Germain – Les Houdoux site in Essonne has been open to inert soil deliveries. The

Read more

Pour recevoir
les dernières actualités d'ECT