ECT workshop at the Union des Maires des Yvelines et des Hauts-de-Seine E-Universities

A workshop to better understand regional planning.

How can we develop territories by reusing excavated building and civil engineering soils?

On Thursday March 25, ECT led a 100% digital workshop at the E-Université de l’Union des Maires et des Yvelines et des Hauts-de-Seine. Our aim was to promote a better understanding of the role of excavated soil in regional planning.

A region transformed by the eco-design model

ECT designs non-built development projects using soil from urban construction sites. These projects respect the environment and promote biodiversity. This is how ECT proposes to breathe new life into derelict sites through concerted environmental projects. And that we create landscaped parks, urban nature areas, sports and leisure facilities and urban agriculture.

A concrete example of regional redevelopment: the Epône project

Two years ago, the Epône project was born at this very show. An emblematic project for ECT and the first of its kind in the Yvelines region. To create the 1st trials and mountain bike site in Ile-de-France.

Ivica Jovic, 1st Deputy Mayor of Epône, took part in the workshop, sharing his very positive experience.

Latest news

Salon Bas-Rhin 2025
03/10/2025

ECT Grand Est at the Bas-Rhin trade fair for municipalities and inter-municipalities

October 2025 – ECT Grand-Est participated for the second year in the Bas-Rhin Mayors and Intermunicipal Authorities Exhibition. It was an opportunity to present our sustainable, non-built development solutions and

Read more
25/09/2025

ECT Hauts-de-France meets the mayors of the Nord region

September 2025 – In Douai, the ECT Hauts-de-France team is participating in the 69th Congress of Mayors and Presidents of Intermunicipal Communities of the North. It has been a day

Read more
Zone déchargement des terres à Coubert
23/09/2025

Coubert agricultural rehabilitation project underway

Discover the progress of the Coubert project in Seine-et-Marne. The gallery shows the key stages: reception of inert soil from local construction sites, quality control and implementation by field teams.

Read more

Pour recevoir
les dernières actualités d'ECT