Opening of a new site in Lens (62)

ECT opens a new site in Lens (62), on avenue de Van-Pelt.

The aim of this site is to transform a former industrial site into an urban forest. This rehabilitation is part of a local and environmental dynamic:

  • reserve and create large green spaces by planting 8,000 trees,
  • integrate biodiversity issues into the project,
  • Limit exposure to nuisance from the A21 freeway.

This new natural area will be developed using inert soil excavated from local construction sites. The expected duration of the earthworks is 3 months.

To access the Lens site, you need to be validated by ECT’s reservations department.

Latest news

ECT Icone ouverture de site
23/02/2026

Opening of Val Saint-Germain Les Houdoux site (91)

Opening of a new ECT site in Essonne (91) Since February 23, 2026, the Val Saint-Germain – Les Houdoux site in Essonne has been open to inert soil deliveries. The

Read more
Miniature - Vidéo présentation Bull
30/01/2026

New hybrid bulldozer and 3D GPS

As part of its commitment to responsible innovation, ECT is expanding its range of public works equipment with the Caterpillar D6 XE hybrid GPS 3D bulldozer (exclusive distributor Bergerat Monnoyeur).

Read more
26/01/2026

Acting for the climate and ecological transition of territories

Climate and ecological transition cannot be decreed. It is built on the ground, project after project, through development choices that are capable of responding to climate requirements, biodiversity issues, and

Read more

Pour recevoir
les dernières actualités d'ECT