Restoring an open-cast quarry

Types of layout
Quarry backfill
Issues :
Site restoration
Project presentation
ECT is involved in rehabilitating a former open-cast quarry by backfilling with excavated soil from construction sites.
The final project involves the creation of a grassy plateau, making the site safer and enhancing its value in the long term.
Backfilling operations are carried out with rigorous management of safety and soil traceability, and in strict compliance with regulations.
Key figures
2025
December, site preparation
2026
January, start of soil inputs
2027
January, end of soil inputs
2027
March, restitution of the site
Project life
Backfilling an open-cast quarry
January 2026 – The ECT site at Villeneuve-les-Sablons opens to our construction and public works customers on January 12. Located 25 km from Val-d’Oise, this site will receive inert soil from construction sites, with the aim of rehabilitating a former open-cast quarry to create a grassy plateau.
Work has been carried out to ensure optimum, safe customer reception and guarantee soil traceability: installation of a receiving station equipped with load control cameras, radioactivity detection gantry, weighbridge.