Backfilling an active underground quarry

Types of layout

Icon - Aménagement Sécurisation

Securing the underground quarry

Issues :

Site security

Status:

In operation,
soil inputs

Project presentation

Securing the Placo® quarry in Baillet-en-France by recycling excavated soil. The Baillet-en-France quarry has an outdoor platform for unloading excavated soil trucks. ECT is in charge of transportation and backfilling operations.

ECT’s expertise enables it to offer the carrier :

  • management of the backfill authorization process, with the dual aim of accommodating the largest possible volume of soil and optimizing the diversity of soil types used,
  • management of all backfilling operations at the quarry (safety, productivity, traceability and environment),
  • commercial management with building and civil engineering contractors to negotiate the terms and conditions of soil inputs,
  • land logistics management, including the installation of a double freight system.

Key figures

2022

New customer experience, open platform

2021

Platform construction work

Project life

Customer innovation

March 2022 – A new earth unloading platform is installed. This platform makes soil unloading safer and simpler, and saves time: 10 minutes to unload the material. Construction work began in 2021 and lasted 6 months, with various trades working on the platform.

Discovering the galleries

Backfilling the quarry with soil corresponds to a procedure for making the galleries safe once mining has been completed. Backfill comes from construction sites. Land traceability is ensured by ECT.

Further information

Environmental and social quality of ECT development projects

Financing and project development

Land traceability, a major challenge

See our examples of achievements

Pour recevoir
les dernières actualités d'ECT