ECT is rehabilitating one of the largest illegal landfill sites in the Ile-de-France region, in the Val-d’Oise (95). Future inflows of excavated inert soil from local construction sites have financed the sorting and removal of litter, which is now complete. Then, in a second phase, they will help shape an agricultural and ecological renewal of the site.
- Val-d'Oise
- ECT Ile de France
Renaturation of the former illegal landfill site at Boissy-L’Aillerie / Puiseux-Pontoise (95)

Latest news

Coubert agricultural rehabilitation project underway
Discover the progress of the Coubert project in Seine-et-Marne. The gallery shows the key stages: reception of inert soil from local construction sites, quality control and implementation by field teams.
Read more
The Adventures of the ECT Water Bottle – Summer 2025
This summer, the ECT water bottle packed its backpack and set off on a unique trip around the world. From the scorching deserts of Death Valley to the salty beaches
Read more
[Appointments] Sofiane Chikh, Director of Development and Planning
ECT is strengthening the development of its projects in the Paris region and elsewhere in France with the arrival of Sofiane Chikh as Director of Development and Planning. As the
Read more