Nature area, reforestation

perspective aménagemements coubert

Rehabilitating farmland in the Paris region

GPS coordinates :   Download brochure Types of layout Agricultural Nature area, reforestation Issues : Farm rehabilitation Renaturation Status: Landscaping completed Project presentation The project to redevelop the Domaine de la Grange-le-Roy is being carried out by Safer Île-de-France, the project owner and landowner. The Grisy-Suisnes part of the estate has already been redeveloped. The project for the land in Coubert involves rehabilitating 11 hectares of pastureland as well as natural wetlands and woodland. Key figures The phasing of the worksite is adapted to the ecological challenges of gradually restoring natural environments. For this reason, the project is being carried

Rehabilitating farmland in the Paris region Read More »

Developing an agricultural and ecological revival on a damaged site

GPS coordinates : Download brochure Types of layout Agricultural Nature area, reforestation Issues : Farm rehabilitation Renaturation Status: Landscaping completed Project presentation Between 2019 and 2023, on the Grange Le Roi site to the west of the commune, in partnership with the SAFER, ECT has carried out the agricultural and ecological transformation of the site. The circular economy of excavated soil is at the heart of the revitalization of this neglected land. Land contributions helped shape and finance the agricultural and ecological revival. Key figures 2019 – 2023 Duration of soil inputs and developments 1 ha returned to agriculture, for

Developing an agricultural and ecological revival on a damaged site Read More »

Safeguarding farmland and ecological continuity

GPS coordinates : Download brochure Types of layout Farm rehabilitation Issues : Agricultural vocation Biodiversity zone Status: Landscaping completed Project presentation At Roissy-en-Brie, the aim of the project is to improve the agricultural capacity of the land and recreate ecological continuity. The project restores and safeguards the agricultural vocation  of the various plots, creating a vast agricultural plateau accompanied by areas of biodiversity. Key figures 2020 Start of 2-year construction project 1 hectares of land returned to agriculture 1 hectares ecological and wetland creation and development 1 hectares wooded slopes Project life Handing over the management guide to the farm

Safeguarding farmland and ecological continuity Read More »

Planting an urban forest on brownfield land

GPS coordinates : Download the brochure Types of layout Nature area, reforestation Issues : Renaturation Green in the city Status: Landscaping completed Project presentation This project, led by the EPF Hauts-de-France, also involves the town of Lens and the Lens-Liévin conurbation community, in conjunction with the Hauts-de-France Region through the Regional Forestry Plan. Unlike a natural forest, an urban forest is the result of design. The EPF designed this forest with a multidimensional approach: ecological, landscape, sensory, well-being and educational. ECT is building it. Key figures September to October 2020 Soil inputs – first phase 1 trees planted September 2022

Planting an urban forest on brownfield land Read More »

A sports, inclusive and educational park: the Parc de l’Arboretum

GPS coordinates : Download the brochure Types of layout Outdoor sports and relaxation area Landscaped urban park Issues : Green and nature in the city Sport in the city Status: Landscaping completed Project presentation The Parc de l’Arboretum in Moissy-Cramayel is a landscaped area accessible to all, designed and built by ECT. The Arboretum Park was landscaped over an 18-month period using soil excavated from nearby construction sites. Moissy-Cramayel and ECT co-designed the project. Key figures June 2019 Inauguration and public opening of the Arboretum Park 1 trees planted 1 month work to build the park 1 kilometers pathways, half

A sports, inclusive and educational park: the Parc de l’Arboretum Read More »

Modélisation du terrain pour la réserve des lions

Developing a natural area as part of the extension of a wildlife park

GPS coordinates : Types of layout Natural area Issues : Renaturation Status: Landscaping completed Project presentation During the extension of the ‘Au Royaume des Lions’ animal park, ECT teams raised and shaped an area in front of the new hotel. Self-financed thanks to inert soil, this new natural grassed area is now home to the park’s lions. Key figures 2023 Works start in spring for 4 months 1 hectares of developed surface area Partners Project life https://www.groupe-ect.com/wp-content/uploads/2024/10/Video-Lumigny.mp4 Opposite the new hotel, a new natural area In Lumigny (77), our intervention financed part of the extension of the animal park. The

Developing a natural area as part of the extension of a wildlife park Read More »

Fontenay-en-Parisis- Décharge sauvage - Fontenay-en-Parisis - Unauthorized landfill

Repair degraded sites, prevent the return of illegal dumping

GPS coordinates : Download brochure Types of layout Nature area, reforestation Issues : Renaturation Status: In project Project presentation In the commune of Fontenay-en-Parisis, a series of worrying events have marked recent years. In April 2021, after six months of illegal occupation, a fire broke out on high ground close to the RN 104, overlooking the Galais ditch valley near Goussainville, on land belonging to the Val d’Oise Departmental Council. In May 2022, new illegal occupations caused two more fires. In the space of a few weeks, large-scale dumping grounds had sprung up, containing rubble, demolition debris, garbage, mattresses, hydrocarbons

Repair degraded sites, prevent the return of illegal dumping Read More »

Vue de l'insertion paysagère aérienne du projet d'Eckwersheim avec les nouveaux espaces sportifs - Aerial view of the landscape integration of the Eckwersheim project with the new sports areas

Develop new outdoor sports facilities on communal land

GPS coordinates : Download brochure Types of layout Outdoor sports and relaxation area Issues : Sport in the city Green in the city Status: In project Project presentation The project is being developed on communal land. It is entirely eco-designed in partnership with the municipality of Eckwersheim, which wishes to expand its range of sports facilities. It proposes the creation of a new natural area for walking, hiking, running, mountain biking and cross-country running. Thanks to their accessibility, these facilities will be accessible to the residents of Eckwersheim, neighboring towns and the northern part of the Strasbourg conurbation. Key figures

Develop new outdoor sports facilities on communal land Read More »

Insertion paysagère, du parc paysager de Vaux-le-Pénil - Landscape integration of the Vaux-le-Pénil landscape park

Transform Tertre des Roches into a nature and leisure area

GPS coordinates : Download the brochure Types of layout Nature area, reforestation Issues : Brownfield redevelopment Renaturation Status: In project Project presentation The aim of the project is to restore and revitalise a neglected and run-down site. In partnership with the municipality of Vaux-le-Pénil, the development plans to restore the natural environments and recreate a landscape unit, in conjunction with the other surrounding mounds. This new walking area, open to the public, will be enhanced by a belvedere and equipped with sports equipment and benches. Quiet areas will be reserved for biodiversity. Key figures 2025 Start of work 1 month

Transform Tertre des Roches into a nature and leisure area Read More »

Pour recevoir
les dernières actualités d'ECT