News

Headlines

News
09/10/2026

ECT Meets with Elected Officials to Transform Their Communities

Helping elected officials and local decision-makers transform their communities: that is the purpose of our on-the-ground meetings. In 2026, our teams participated in 10 trade shows and conferences across 4

Read more
Salon Hauts-de-France - ©Lena Heleta
[display_actus_filters]
Baptiste conducteur de bull
16/10/2026

From a Work-Study Program to a Permanent Contract: The Journey of a Heavy Equipment Operator

At our sites, a bulldozer operator shapes the terrain using soil from construction sites. At the controls of his machine, he pushes, spreads, and levels these materials to give them a second life: embankments, landscaped mounds, and future parks. In this way, this inert soil becomes the building block for new landscapes. That’s how Baptiste learned his trade. He joined ECT as a work-study student after earning a CAP in heavy equipment operation, and he learned the ropes from his supervisor, Dimitri, and alongside his mentor, Belmiro. Upon completing his work-study program, he was hired on a permanent contract. After

Read more
Inauguration Mazingarbe
07/10/2026

Terril 49 in Mazingarbe: Forest, Seed Orchard, and Greenway Inaugurated

On October 7, nearly 50 people gathered in Mazingarbe to inaugurate the forest area, the seed orchard, and the greenway developed at the foot of slag heap 49. At the heart of the project is a seed orchard with 1,250 trees, surrounded by a forest and farmland. This transformation was made possible by the circular economy of construction and public works land. An inauguration attended by local stakeholders The ribbon was cut by Sandra Guthleben, subprefect of Lens; Laurent Poissant, mayor of Mazingarbe; Michel Marchyllie, executive director of Espaces naturels régionaux (ENRx); and Julien Golaszewski of ECT. The morning concluded

Read more
ECT signe la Charte métropolitaine pour une construction circulaire
22/09/2026

ECT Signs the MGP Charter for Circular Construction

Circular construction is a collective endeavor. It is with this conviction that Sofiane Chikh, Director of Development and Planning at ECT, signed the Metropolitan Charter for Circular Construction, spearheaded by the Greater Paris Metropolis. A signing ceremony at SIBCA, attended by metropolitan elected officials The signing ceremony took place at SIBCA, the Low-Carbon Real Estate Trade Show. Entirely dedicated to this topic, the trade show aims to place low-carbon strategies at the heart of real estate development. Two elected officials from the Greater Paris Metropolis attended the signing ceremony. Xavier Lemoine, mayor of Montfermeil, represented the circular, collaborative, social, and

Read more
ECT Icone ouverture de site
16/09/2026

Start of soil deliveries for the Carrières-sur-Seine project (78)

Opening of a new ECT facility in Carrières-sur-Seine (78) Since September 21, ECT has been accepting inert soil (K3) at its new facility in Carrières-sur-Seine. This facility offers construction companies a local, secure solution that complies with traceability requirements for inert soil. Bringing in inert soil to the site Accessible from RD 311, it enjoys a prime location, right next to the A13 and A86 highway exits. To ensure safety and keep traffic flowing smoothly, exit from the site is regulated. Trucks must follow this route : Chemin des Houilles → Chemin des Bombes → Chemin des Douaires → Route

Read more
Projet Carrières sur Seine ECT
20/07/2026

New ECT Project in Carrières-sur-Seine

In Carrières-sur-Seine (78), ECT is securing a hazardous site and rehabilitating vegetable-growing land—all without spending any public funds. ECT leads and implements this projectin partnership with the City of Carrières-sur-Seine, the Saint-Germain Boucles-de-Seine Urban Community, and Grand Paris Aménagement. Phase 1 · Securing Hazardous Sites – 16.5 hectaresECT is filling in the former underground tunnels to eliminate any risk of collapse. Inert soil from local construction sites will be used as backfill material. Any illegal dumping currently present will first be removed and sent to approved disposal facilities. Phase 2 · Agricultural and Ecological Restoration – 5 hectares ECT has

Read more
ECT ouverture d'un site de réception de terres inertes
18/07/2026

Opening of a location in Fontenay-Trésigny (77)

ECT has opened a new site in Fontenay-Trésigny (77). As of July 20, the site is open for the delivery of inert soil, subject to prior reservation with the sales department. It accepts Class 3 (K3) soil. All types of trucks are accepted at the site. Access is regulated: it is mandatory to use the RD 1036 both on the way there and on the way back. For trucks coming from the RN4, the left-turn lane must be used. On the way back, at the stop sign at the site exit, you must turn right onto the D3 1036. Everything

Read more

Pour recevoir
les dernières actualités d'ECT